This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
biac:scanners [2013/12/17 01:44] cmp12 [Cluster] |
biac:scanners [2013/12/17 01:45] cmp12 [GE MR750 3T Scanner (BIAC5 & BIAC6)] |
||
---|---|---|---|
Line 16: | Line 16: | ||
Actual measurements of the fringe field on 10/14/2009 were as follows: 5 gauss line 4 inches toward the magnet from the window. The field at the projector is 8 gauss; the field at the corner of the cabinet closest to the magnet is 25 gauss, and the field at the end of the table is 15 gauss. | Actual measurements of the fringe field on 10/14/2009 were as follows: 5 gauss line 4 inches toward the magnet from the window. The field at the projector is 8 gauss; the field at the corner of the cabinet closest to the magnet is 25 gauss, and the field at the end of the table is 15 gauss. | ||
- | The current software platform on BIAC5 is 20x (8/27/10). | + | The current software platform on BIAC5 is 23x (12/1/13). |
The current software platform on BIAC6 is 23x (3/6/13). | The current software platform on BIAC6 is 23x (3/6/13). | ||