User Tools

Site Tools


biac:scheduling

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
biac:scheduling [2019/07/10 17:28]
mcb104 [BIAC Scheduling and Billing FAQ]
biac:scheduling [2019/11/07 20:13]
ane5
Line 1: Line 1:
-====== BIAC Sche + 
-duling and Billing FAQ ======+ 
 +======BIAC Scheduling & Billing FAQs ======
  
  
Line 22: Line 23:
  
 //Null.01 should ONLY be used to avoid double-booking a MR Tech. Be sure to check the notes (in blue) at the stop of the scanner schedule to see exceptions to the normal Tech schedule. The experimenter is responsible for placing Null.01 on the opposite scanner during single MR Tech coverage. If your study starts at a time when there are 2 Techs available and continues to a time when only 1 is available, you need to put Null.01 on the opposite calendar for just the time when there is single Tech coverage. If you think someone forgot to schedule a Null.01, please contact the BIAC Main Office before scheduling your study. In the event of a double-booking, the study that scheduled first (but failed to add a Null) will be rescheduled.// //Null.01 should ONLY be used to avoid double-booking a MR Tech. Be sure to check the notes (in blue) at the stop of the scanner schedule to see exceptions to the normal Tech schedule. The experimenter is responsible for placing Null.01 on the opposite scanner during single MR Tech coverage. If your study starts at a time when there are 2 Techs available and continues to a time when only 1 is available, you need to put Null.01 on the opposite calendar for just the time when there is single Tech coverage. If you think someone forgot to schedule a Null.01, please contact the BIAC Main Office before scheduling your study. In the event of a double-booking, the study that scheduled first (but failed to add a Null) will be rescheduled.//
 +
 +*** What is BIAC's policy on Experimenters Making Scheduling Errors?**
 +
 +__BIAC's Policy on Excessive Scheduling Errors__
 +If a user/scheduler fails to schedule Null.01 during single tech coverage or schedules all/part of their session outside of the normal or posted tech hours the following will happen:
 +• 1st Offense – Scheduler gets notified about the policy and New User Orientation. 
 +• 2nd Offense – MR Director, Todd Harshbarger, notifies the Scheduler and the Responsible PI (in most cases this is the supervisor) about the severity of the situation, the second offense, and that on the third offense scheduling rights will be taken away.
 +• 3rd Offense – Director of BIAC, Allen Song, notifies the Scheduler and the Responsible PI that the third offense has occurred and that the scheduler’s scheduling rights have been removed.
 +
 +//This policy was implemented on November 7, 2019.//
 +
 +
  
biac/scheduling.txt · Last modified: 2023/10/25 22:36 by jel76