User Tools

Site Tools


jvs:fscan:manual:chapter2:setschedule

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
jvs:fscan:manual:chapter2:setschedule [2012/05/04 18:04]
voyvodic
jvs:fscan:manual:chapter2:setschedule [2023/02/23 18:43] (current)
Line 14: Line 14:
 Linked schedule files can be used by the [[jvs:fscan:manual:chapter2:reference|Reference]] command to create a reference time course for use in image processing. Linked schedule files can be used by the [[jvs:fscan:manual:chapter2:reference|Reference]] command to create a reference time course for use in image processing.
  
-Naming convention for schedule files\\+**Naming convention for schedule files**\\
 Schedule file names are not required to follow any particular naming convention, but fScan recognizes 4 naming styles to help automatically extract condition names and to organize schedule lists into separate groups. Schedule file names are not required to follow any particular naming convention, but fScan recognizes 4 naming styles to help automatically extract condition names and to organize schedule lists into separate groups.
 Schedule files can be organized in groups to allow the events for a task to be separated in different ways.  Within a group, events should not overlap in time.  Schedule groups can be specified by either a number or a single letter.  Schedule files can be organized in groups to allow the events for a task to be separated in different ways.  Within a group, events should not overlap in time.  Schedule groups can be specified by either a number or a single letter. 
jvs/fscan/manual/chapter2/setschedule.1336154683.txt.gz · Last modified: 2014/08/04 16:03 (external edit)